This project consisted of improvements to Oak Drive from Oakdale Road to South Cobb Drive. The improvements included straightening the alignment, stabilizing the existing road, adding curb and gutter and…
This project consisted of improvements to Oak Drive from Oakdale Road to South Cobb Drive. The improvements included straightening the alignment, stabilizing the existing road, adding curb and gutter and…
Boulevard concept from South Cobb Drive to Atlanta Road that includes widening, addition of medians, intersection and pedestrian improvements. This phase includes the boulevard conceptual design and the engineering of…
The design consultant developed a traffic signal master plan. This plan analyzed the City of Smyrna’s current traffic signal inventory and made recommendations for improvements to the signal system. Based…
This project involved the improvements to Argo Road completed by Cobb County DOT. Improvements included widening the road to a standard residential width, installation of sidewalk, curb & gutter, and…
A turn lane, sidewalk and retaining wall were added at the intersection of Cooper Lake Road and the East-West Connector.
Improvements to various intersections within the City to upgrade and improve traffic flow and safety. Examples of these projects are listed below. Future projects will be identified and completed as…
These improvements will be at various locations throughout the City of Smyrna that will be beneficial in terms of relieving traffic congestion and improving the air quality in the area….
This project provided four-quadrant gates at two railroad crossings. These gates eliminate the need for railroad whistles to announce the oncoming trains. Quiet zones are provided at the following locations:…
This project involves the installation of a multi-use trail on Spring Road from Village Parkway to the CSX railroad crossing. Phase 1 includes the section from Village Parkway to Mosaic…
This project involved the creation of a pedestrian trail off Spring Road along Poplar Creek.