Various paths and sidewalk improvements, including new sidewalks and upgrades to existing sidewalks Sidewalk Projects – Lake Drive, Cooper Lake Road near EW Connector, Bell Dr, Barbara Ln, Spring Dr,…
Informed through the Smyrna B.O.L.D. Downtown Master Plan citizen and stakeholder input, the Smyrna Downtown Improvements is a SPLOST 2022 project. Aimed at building upon the success of the existing…
Various path and sidewalk improvements, including new sidewalks and upgrades to existing sidewalks.
List of resurfacing projects to begin late august/ Early September 2021.
Pedestrian crossing improvements; multi-use trial on Windy Hill Road from Atlanta Road to Village Parkway; and pedestrian crossing improvements along South Cobb Drive.
Various methods and improvements focused on relieving traffic congestion, such as road improvements, the addition of turn lanes, and signal timing.
Replace and rehabilitate existing street signage, signal poles and mast arms.
New curb and gutter will be installed in conjunction with sidewalk projects